Feed Item
Added a post 
A 3:2 High Court held that a NSW coal mine extension approval was invalid because the Commission never considered conditions to minimise Scope 3 emissions, 98% of the project's emissions. The duty was to consider such conditions, not to impose them.
SSL Certificates